Planning is where many self-builds stall. nHouse prepares the design, drawings and supporting information for your application, deals with the planning officer and works through the conditions after approval, so the house you get permission for is one that can actually be built to your budget.

Come to us for this on its own, or as one stage of a build we take from plot to handover.
Where a site is sensitive, an early conversation with the council saves time. We prepare the information for a pre application enquiry and use the response to shape the design before a full submission.
Plans, elevations, sections and a site layout that show the house as it will be built, with materials that suit the setting and a design already checked for buildability and cost.
Design and access statements, and the specialist reports a site may need, such as ecology, trees, flood risk or heritage, coordinated so the application goes in complete.
Discharge of conditions after approval, and amendments if the design needs to change, so nothing on site ends up waiting on paperwork.
No. Planning looks at what the house looks like, how it sits on the plot and its effect on neighbours and the landscape, not at how it is built. Whether the house is built traditionally, from SIPS panels or as modules, it can be clad and roofed in whatever the setting calls for, from timber and zinc to brick and render.
Sometimes, but the rules are tighter. In the Green Belt the usual routes are replacing an existing house or limited infilling within a village, and in a National Landscape the design has to respond carefully to its setting. We look at the site and the local policies before recommending you spend money on an application.
Where a council charges Community Infrastructure Levy, people building their own home can usually claim an exemption, but the claim has to be made and accepted before work starts on site. Missing that step can mean a large bill, so it is built into our programme.
Councils aim to decide an application for a single new home within eight weeks of it being validated, although many take longer, and sensitive sites often need pre application work first. We will give you a realistic view for your council when we look at the site.
Yes. Once planning is in place, building control approval, structural design and the warranty provider's requirements all follow as part of the design stage.
Most clients start with a question, not a build. We work at whatever point you have reached.

Honest early advice on whether a plot, a budget and an idea actually work together.
Read more
What a plot can take, what it will cost to build there and what the planning position is likely to be.
Read more
Developing, or preparing your existing design, into something that can be built to cost and to programme.
Read moreYou do not need drawings, a planning decision or a fixed budget to talk to us. Most of our clients did not have any of those when they got in touch.
Tell us about your plotSend us what you have so far, a location, a sketch, a planning reference or just a question. We will come back to you with an honest view of where you stand.